Elevator Driving Spare Part Electrical Elevator Traction Machine
Using the permanent magnet synchronous gearless traction machine as the power source, it is small in size and compact in structure, which can meet the design requirements of small machine room and provide more free design space for architectural design.
Specification table
• In-house made high-performance NdFeB magnet is adopted.
• The magnets are double fixed and imported thermal switches are furnished, all of which ensure the reliability of the machine performance.
• Unique rotating shaft and rotor construction brings smooth operation of machine and low noise level.
FAQ
Q1: How can I get CONAI updating products catalog?
A1: 1- Pleae contact our sales manger to ask them for it;
2- Self-downloa from CONAI official website;
Q2: How can we pay for trail order or sample?
A2: There is some option for your select: Paypal, Western Union, Wise, Alipay, Cash by USD or CNY or EUR;
Q3: Can I have a sample for testing?
A3: Yes, we offer the charge sample, sample will be 20% higher than offer, and this parts will be back in the bulk order.
Q4: Can I add my logo on the elevator parts?
A4: Yes, we do OEM and ODM service with MOQ required to our valued customer.
Meanwhile please share us the Trademark authorization letter for avoid any problem in the near future.
Q5: How can I enjoy CONAI's after-service?
A5: Actually, after you cooperate with CONAI, We are ready to provide after-sales serivce at any time.
Q6: Do you have inspection procedures for elevator parts?
A6: 100% self-inspection before packing.
Q7: Can we mix the 20GP container?
A7: Yes, if the items are meet our min order qty.
Q8: How can I place the order to you?
A8: Here is our order SOP:
1st-- Email our sales manager to talk the order detail;
2nd-- Making the offical quotation sheet for your reference;
3rd-- Sending the Proforma Invoice with deal price for your payment;
4th-- Production the cargo and ready to shipment;
5th-- FOB team, the shipment will be send out by your named forwarder;
6thCIF term, we will handle with all process by our side for shipment.
Q9: What is the delivery time of the parts?
A9: According to the inventory of different parts, the delivery time is also different;
if its in stock, within 3-7 days delivery time; and delivery within 7-30 days if no stock available;